Identification

Title
Berbera Corridor Annotations
Abstract

The Berbera Corridor links the port in Berbera in Somalia to Ethiopia via Jigjiga and Dire Dawa, where it connects to the Djibouti Corridor and on to Addis Ababa. The development of the corridor has been designated a high priority by the government in Ethiopia as an alternative to the Djibouti Corridor, and was named as a priority programme in the 2011 Horn of Africa (HoA) Initiative, and was again included as a high priority in the 2014 World Bank HoA Initiative. The corridor is also an AU priority under the Programme for Infrastructure Development in Africa (PIDA) endorsed by Heads of State in 2012. The Government of Ethiopia, in the Growth and Transformation Plan (GTP) 2, has set a target to diversify 30% of trade from the port of Djibouti to Berbera by 2025.

License
Public Domain (PD)
+ Works in the public domain may be used freely without the permission of the former copyright owner.

+ For more info see http://www.copyright.gov/help/faq/faq-definitions.html.
Publication Date
Nov. 23, 2020, 12:34 a.m.
Keywords
PIA2: Market and Trade GOAL 9: Industry Innovation and Infrastructure
Category
Transportation
means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
Regions
Africa, Somalia
Approved
Yes
Published
Yes
Featured
No
Group
IGAD Region
DOI
Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
Attribution
Owner
Responsible

Name
IGAD_SEC (IGAD_SEC)
email
Position
None
Organization
IGAD Secretariat
Location
DJIBOUTI DJI
Voice
None
Fax
None
Information

Identification Image
Spatial Extent
---
Projection System
EPSG:4326
Extension x0
41.765991656000000
Extension x1
45.008630385000100
Extension y0
9.180899989000070
Extension y1
10.435973194000000
Features

Maintenance Frequency
Frequency Of Maintenance For The Data Is Not Known
Restrictions

No Other Restrictions

Edition
Version 1.0
Purpose

The map annotations was generated to describe/ annotate in details features of interest in the current status(as at 2019) of physical infrastructure on t…

Language
English
Temporal Extent
Nov. 23, 2020, 3:36 a.m. - Nov. 23, 2020, 3:36 a.m.
Data Quality

Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.

Supplemental Information

BERBERA Corridor Roads map annotation. Organized into 4 horizons namely; 1. Current status as at 2019 2. Short term 3. Medium Term 4. Long Term

Spatial Representation Type
vector data is used to represent geographic data
Contact Points

Name
IGAD_SEC (IGAD_SEC)
email
Position
None
Organization
IGAD Secretariat
Location
DJIBOUTI DJI
Voice
None
Fax
None

References

Link Online
/documents/601
Metadata Page
/documents/601/metadata_detail
Online Link
/documents/601/download

Metadata Author

Name
IGAD_SEC (IGAD_SEC)
email
Position
None
Organization
IGAD Secretariat
Location
DJIBOUTI DJI
Voice
None
Fax
None
#}