Identification

Title
Massawa Corridor Annotations
Abstract

The Massawa Corridor is not currently functional as a trade route between Eritrea and Ethiopia due to the unclear status of the borders. Prior to the 1998 conflict and subsequent closing of the borders, both countries enjoyed what was essentially a common market. Cross-border trade flowed freely, with neither tariff nor non-tariff barriers. Eritrea’s introduction in 1997 of its own currency, the Nakfa, made cross-border trade more complicated, but had little impact on commerce. Ethiopia also had full access to the Eritrean ports of Assab and Massawa with its own customs facility in Assab where they cleared imports destined for Ethiopian markets. It is recommended that a bilateral agreement is signed between the two countries to revert back to their former status as a starting point for continued relations.

License
Not Specified
+ The original author did not specify a license.

Publication Date
Nov. 20, 2020, 12:35 p.m.
Keywords
PIA2: Market and Trade GOAL 9: Industry Innovation and Infrastructure
Category
Transportation
means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
Regions
Global
Approved
Yes
Published
Yes
Featured
No
Group
IGAD Region
DOI
Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
Attribution
Owner
Responsible

Name
IGAD_SEC (IGAD_SEC)
email
Position
None
Organization
IGAD Secretariat
Location
DJIBOUTI DJI
Voice
None
Fax
None
Information

Identification Image
Spatial Extent
---
Projection System
EPSG:4326
Extension x0
36.335020841000100
Extension x1
40.003995824000100
Extension y0
9.010189979000070
Extension y1
15.780360657000100
Features

Maintenance Frequency
Frequency Of Maintenance For The Data Is Not Known
Restrictions

No Restrictions

Edition
Version 1.0
Purpose

The map annotations was generated to describe/ annotate in details features of interest in the current status(as at 2019) of physical infrastructure on t…

Language
English
Temporal Extent
Nov. 20, 2020, 3:44 p.m. - Nov. 20, 2020, 3:44 p.m.
Data Quality

Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.

Supplemental Information

Massawa Corridor Roads map annotation. Organized into 4 horizons namely; 1. Current status as at 2019 2. Short term 3. Medium Term 4. Long Term

Spatial Representation Type
vector data is used to represent geographic data
Contact Points

Name
IGAD_SEC (IGAD_SEC)
email
Position
None
Organization
IGAD Secretariat
Location
DJIBOUTI DJI
Voice
None
Fax
None

References

Link Online
/documents/592
Metadata Page
/documents/592/metadata_detail
Online Link
/documents/592/download

Metadata Author

Name
IGAD_SEC (IGAD_SEC)
email
Position
None
Organization
IGAD Secretariat
Location
DJIBOUTI DJI
Voice
None
Fax
None
#}