- Title
- Massawa Corridor Annotations
- Abstract
The Massawa Corridor is not currently functional as a trade route between Eritrea and Ethiopia due to the unclear status of the borders. Prior to the 1998 conflict and subsequent closing of the borders, both countries enjoyed what was essentially a common market. Cross-border trade flowed freely, with neither tariff nor non-tariff barriers. Eritrea’s introduction in 1997 of its own currency, the Nakfa, made cross-border trade more complicated, but had little impact on commerce. Ethiopia also had full access to the Eritrean ports of Assab and Massawa with its own customs facility in Assab where they cleared imports destined for Ethiopian markets. It is recommended that a bilateral agreement is signed between the two countries to revert back to their former status as a starting point for continued relations.
- License
- Not Specified
-
+ The original author did not specify a license.
- Publication Date
- Nov. 20, 2020, 12:35 p.m.
- Keywords
- PIA2: Market and Trade GOAL 9: Industry Innovation and Infrastructure
- Category
- Transportation
- means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
- Regions
- Global
- Approved
- Yes
- Published
- Yes
- Featured
- No
- Group
- IGAD Region
- DOI
- Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
- Attribution
- Owner
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None
- Spatial Extent
- ---
- Projection System
- EPSG:4326
- Extension x0
- 36.335020841000100
- Extension x1
- 40.003995824000100
- Extension y0
- 9.010189979000070
- Extension y1
- 15.780360657000100
- Maintenance Frequency
- Frequency Of Maintenance For The Data Is Not Known
- Restrictions
-
No Restrictions
- Edition
- Version 1.0
- Purpose
The map annotations was generated to describe/ annotate in details features of interest in the current status(as at 2019) of physical infrastructure on t…
- Language
- English
- Temporal Extent
- Nov. 20, 2020, 3:44 p.m. - Nov. 20, 2020, 3:44 p.m.
- Data Quality
Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.
- Supplemental Information
Massawa Corridor Roads map annotation. Organized into 4 horizons namely; 1. Current status as at 2019 2. Short term 3. Medium Term 4. Long Term
- Spatial Representation Type
- vector data is used to represent geographic data
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None
- Link Online
- /documents/592
- Metadata Page
- /documents/592/metadata_detail
- Online Link
- /documents/592/download
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None