- Title
- Kismayu Corridor Maps Annotation
- Abstract
Kismayo Corridor has highways linking the port of Kismayu to the port of Mogadishu and an international road linking Somalia to Kenya through Liboi. However, there is need for major construction, rehabilitation and upgrading works and investments in ICT and energy to be undertaken on the Kismayo corridor to make the corridor more competitive for trade and achieve an economic development corridor status. This has been planned for the future as the priority is to rehabilitate the primary roads within the corridor and border crossing to Kenya at Liboi so that the corridor can once again function as a trade corridor.
- License
- Public Domain (PD)
-
+ Works in the public domain may be used freely without the permission of the former copyright owner.
+ For more info see http://www.copyright.gov/help/faq/faq-definitions.html. - Publication Date
- Nov. 23, 2020, 1:30 a.m.
- Keywords
- PIA2: Market and Trade GOAL 9: Industry Innovation and Infrastructure
- Category
- Transportation
- means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
- Regions
- Africa, Somalia
- Approved
- Yes
- Published
- Yes
- Featured
- No
- Group
- IGAD Region
- DOI
- Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
- Attribution
- Owner
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None
- Spatial Extent
- ---
- Projection System
- EPSG:4326
- Extension x0
- 37.066170600000100
- Extension x1
- 42.815097920000000
- Extension y0
- -1.180525399999960
- Extension y1
- 2.810433977000060
- Maintenance Frequency
- Frequency Of Maintenance For The Data Is Not Known
- Restrictions
-
No other restrictions
- Edition
- Version 1.0
- Purpose
The map annotations was generated to describe/ annotate in details features of interest in the current status(as at 2019) of physical infrastructure on t…
- Language
- English
- Temporal Extent
- Nov. 23, 2020, 4:34 a.m. - Nov. 23, 2020, 4:34 a.m.
- Data Quality
Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.
- Supplemental Information
Kismayo Corridor Roads map annotation. Organized into 4 horizons namely; 1. Current status as at 2019 2. Short term 3. Medium Term 4. Long Term
- Spatial Representation Type
- vector data is used to represent geographic data
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None
- Link Online
- /documents/607
- Metadata Page
- /documents/607/metadata_detail
- Online Link
- /documents/607/download
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None