- Title
- Port Sudan Corridor Maps Annotation Maps
- Abstract
The Port Sudan Corridor is the most extensive in the IGAD region in terms of distance and coverage, connecting the port of Port Sudan and the new development 46 km south at Suakin to the hinterland of Sudan, Ethiopia and South Sudan. The port of Port Sudan is the third busiest in the region and serves as the primary port for Sudan handling 90% of imports and exports, as well as the primary port for South Sudan’s oil exports, and handles a small share of Ethiopia’s trade. The corridor has two crude oil pipelines that connect oil fields in Sudan and South Sudan with the refinery and port in Port Sudan: Greater Nile Pipeline, constructed in 1999; and Petrodar Pipeline, constructed in 2005. The corridor is multi-modal with the full complement of road, rail, crude oil and petroleum product pipelines, as well as inland container depots.
- License
- Public Domain (PD)
-
+ Works in the public domain may be used freely without the permission of the former copyright owner.
+ For more info see http://www.copyright.gov/help/faq/faq-definitions.html. - Publication Date
- Nov. 9, 2020, 10:25 a.m.
- Keywords
- PIA2: Market and Trade GOAL 9: Industry Innovation and Infrastructure
- Category
- Transportation
- means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
- Regions
- Global
- Approved
- Yes
- Published
- Yes
- Featured
- No
- Group
- Sudan
- DOI
- Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
- Attribution
- Owner
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None
- Spatial Extent
- ---
- Projection System
- EPSG:4326
- Extension x0
- 27.379321766000000
- Extension x1
- 38.881415800000100
- Extension y0
- 4.809045229000050
- Extension y1
- 21.799558800000100
- Maintenance Frequency
- Frequency Of Maintenance For The Data Is Not Known
- Restrictions
-
No Restriction
- Edition
- Version 1.0
- Purpose
The map was generated to show the current status(as at 2019) of physical infrastructure on the Port Sudan Corridor, 2019,2024,2030,2050
- Language
- English
- Temporal Extent
- Nov. 9, 2020, 1:30 p.m. - Nov. 9, 2020, 1:30 p.m.
- Data Quality
Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.
- Supplemental Information
Port Sudan corridor Roads status as at end of 2019.
- Spatial Representation Type
- vector data is used to represent geographic data
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None
- Link Online
- /documents/583
- Metadata Page
- /documents/583/metadata_detail
- Online Link
- /documents/583/download
- Name
- IGAD_SEC (IGAD_SEC)
- Position
- None
- Organization
- IGAD Secretariat
- Location
- DJIBOUTI DJI
- Voice
- None
- Fax
- None