Title
Berbera Corridor Roads Horizon (2019,2024,2030,2050)
License
Public Domain (PD)
+ Works in the public domain may be used freely without the permission of the former copyright owner.

+ For more info see http://www.copyright.gov/help/faq/faq-definitions.html.
Abstract

The Berbera Corridor links the port in Berbera in Somalia to Ethiopia via Jigjiga and Dire Dawa, where it connects to the Djibouti Corridor and on to Addis Ababa. The development of the corridor has been designated a high priority by the government in Ethiopia as an alternative to the Djibouti Corridor, and was named as a priority programme in the 2011 Horn of Africa (HoA) Initiative, and was again included as a high priority in the 2014 World Bank HoA Initiative. The corridor is also an …

Pubblication Date
Type
Vector Data
Keywords
PIA2: Market and Trade , GOAL 9: Industry Innovation and Infrastructure
Category
Transportation
means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
Regions
Africa , Somalia
Responsible
Group
IGAD Region
DOI
Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
Attribution
Owner
More info
-
Maintenance Frequency
Frequency Of Maintenance For The Data Is Not Known
Restrictions
<p>No Other Restrictions</p>
Edition
Version 1.0
Purpose

<p>The map was generated to show the current status(as at 2019) of physical infrastructure on the Berbera Corridor, 2019 Their are four other horizons…

Language
English
Temporal Extent
Nov. 23, 2020, 3:21 a.m. - Nov. 23, 2020, 3:21 a.m.
Data Quality
<p>Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.</p>
Supplemental Information

<p>Berbera Corridor Roads status as at end of 2019. "Current Status" attribute states whether the Berbera corridor segment is Paved or UnPaved</p>

Spatial Representation Type
vector data is used to represent geographic data

Layer WMS GetCapabilities document

Attribute Name Label Description
fid
SEGMENT Segment
ROUTE Route
SUBSECTOR Sub Sector
CURRENT_ST Current Status
DESIGN_CAP Design Capacity
DEMAND_201 Demand 2017
DEMAND_202 Demand 2020
DEMAND_203 Demand 2030
DEMAND_205 Demand 2050
PROJECT_ID Project ID
STAGE Stage
SEQUENCING Sequencing
COST Cost
NEW_CAPACI New Capacity
Shape_Leng Length

Comments (0 total)

Log in to add a comment

Average Rating

(0)

Favorite

Log in to add/delete Favorites.

#}