Title
Massawa Corridor Trade Volume Horizons (2019, 2024,2030,2050)
License
Not Specified
+ The original author did not specify a license.

Abstract

The traffic volumes for Massawa for the four horizons. Their are four other horizons by which one can visualize the status of the Massawa Corridor Trade Volume. The other horizons are; 1. 2017 2. Short Term(2020 to 2024) 3. Medium Term (2025 to 2030) 4. Medium Term (2030 to 2050)

Pubblication Date
Type
Vector Data
Keywords
PIA2: Market and Trade , GOAL 9: Industry Innovation and Infrastructure
Category
Transportation
means and aids for conveying persons and/or goods. Examples: roads, airports/airstrips, shipping routes, tunnels, nautical charts, vehicle or vessel location, aeronautical charts, railways
Regions
Africa , Eritrea
Responsible
Group
IGAD Region
DOI
Multi-modal with road, rail, crude oil and petroleum pipelines, as well as trans-border power and ICT connections. However this layer represents the road component only
Attribution
Owner
More info
-
Maintenance Frequency
Frequency Of Maintenance For The Data Is Not Known
Restrictions
<p>No other restrictions</p>
Edition
Version 1.0
Purpose

<p>Estimating Transport Demand: To forecast future demand for transport infrastructure along the trans-border IGAD corridors we use a Trade: GDP multi…

Language
English
Temporal Extent
Nov. 24, 2020, 10:14 a.m. - Nov. 24, 2020, 10:14 a.m.
Data Quality
<p>Disclaimer: The designations employed and the map presentations do not imply the expression of any opinion whatsoever on the part of the IGAD concerning the legal status of any country, territory, city, area of its authorities, place names, or the delineation of its frontiers or boundaries.</p>
Supplemental Information

<p>Intra-regional trade flows between IGAD member states are relatively low in comparison to other RECs at around $2.7 billion compared to $9.15 billion for EC…

Spatial Representation Type
vector data is used to represent geographic data

Layer WMS GetCapabilities document

Attribute Name Label Description
fid
OBJECTID
PRIORITY Priority
Notes Notes
RteNme Route Name
Corridor Corridor
Project Project
Status Status
Country Country
CorName Corridor Name
Type Type
Demand_201 Demand 2017
Demand_202 Demand 2025
Demand_203 Demand 2030
Demand_205 Demand 2050
Shape_Leng Length

Comments (0 total)

Log in to add a comment

Average Rating

(0)

Favorite

Log in to add/delete Favorites.

#}